HOME | CONTACTS | 中文版 | English 
 
ABOUT US
SEARCH
CONTACTS
TEL:
86-13388580556

Add.:No.27 East Huancheng 
Road,Liushi Town,Yueqing 
City,Zhejiang Province,
325604 China

Zip:325619
Tel:86-13388580556
Fax:86-577-61759560
Skype:rh006@rhkeji.com
CURRENT LOCATION:HOME> NEWS
Precautions power meter
Author:admin Published on:2014/12/25 16:52:13

When using a power meter should be noted that:

 

When selecting auxiliary power must be careful, if the measured voltage universal auxiliary power meter test when it is normal, power meter bright lights or not, you can try to restart the power, if still no effect, contact your service provider.

 

In the back of the Power Meter tab, find the parameters of the instrument. After configuring the instrument, you must ensure that the instrument is connected correctly, in strict accordance with the operating instructions.

 

Power Meter energy pulse through design, implementation, statistical energy data, display, capture, transmit information. When using the instrument, if it is the first time, you must first check whether the instrument parameters and distribution system for the same parameters.

 

If you are using electricity meters process, we found no bright light meter, first check the auxiliary power supply model is matched correctly received the auxiliary power terminals, generally do not support the use of auxiliary power models, the burn will be unrecoverable instruments.

Copyright © Yueqing Renhe Electrical Technology Co., Ltd. All Rights Reserved. Technical support:lianke.cn